• 대한전기학회
Mobile QR Code QR CODE : The Transactions of the Korean Institute of Electrical Engineers
  • COPE
  • kcse
  • 한국과학기술단체총연합회
  • 한국학술지인용색인
  • Scopus
  • crossref
  • orcid

References

1 
MOLIT Ordinance No. 1480, partially amended Apr. 11, "Railway Construction Rules (철도건설규칙)," Ministry of Land, Infrastructure and Transport, 2025. MOLIT Ordinance No. 1480, partially amended Apr. 11 Google Search
2 
Korea National Railway, "Railway Design Guidelines and Manual - Electric Traction Power Volume (철도설계지침 및 편람(전철전력편)), KR CODE; Korea Railway Standards (KRS) management system," Korea National Railwayhttps://krs.krri.re.kr and https://www.kr.or.kr/ Google Search
3 
World Trade Organization, "Agreement on Technical Barriers to Trade (TBT Agreement)," 1995. Article 2.4 Google Search
4 
Y.-J. Chang, J.-D. Jung, J.-C. Lee, "Analysis and Review of International Standards (UIC, EN, IEC) and Domestic Standards (Test Methods) for Climatic Environmental Testing of Railway Vehicles," Journal of the Korea Academia-Industrial Cooperation Society, vol. 21, no. 12, pp. 782-789, 2020. Google Search
5 
Y.-K. Kim, C.-K. Park, J.-H. Ryu, "A Comparative Analysis on Vibration and Shock Test Methods for Railway Rolling Stock Equipment," Journal of the Korean Society for Railway, vol. 16, no. 4, pp. 246-252, 2013. DOI
6 
Korea Railroad Research Institute, "A Study on International Harmonization of Test Standards for Urban Maglev Railway Components (vol. 7)," Ministry of Land, Infrastructure and Transport, 2017. R&D Report Google Search
7 
"IEC 60913:2024 (Edition 3.0), Railway Applications – Fixed Installations – Electric Traction Overhead Contact Line Systems," IEC, IEC, 2024. Google Search
8 
"EN 50119:2020, Railway Applications – Fixed Installations – Electric Traction Overhead Contact Lines," CENELEC, CENELEC, 2020. Google Search
9 
"EN 50149:2012+Cor.1:2025, Railway Applications – Fixed Installations – Electric Traction Overhead Contact Lines – Copper and Copper Alloy Grooved Contact Wires," CENELEC, CENELEC, 2025. Google Search
10 
"IEC 62486:2017 (Edition 2.0), Railway Applications – Current Collection Systems – Technical Criteria for the Interaction between Pantograph and Overhead Contact Line (to Achieve Free Access)," IEC, IEC, 2017. Google Search
11 
"EN 50367:2020+A1:2022, Railway Applications – Fixed Installations and Rolling Stock – Criteria to Achieve Technical Compatibility between Pantographs and Overhead Contact Line," CENELEC, CENELEC, 2022. Google Search
12 
"EN 50318:2018+A1:2022, Railway Applications – Current Collection Systems – Validation of Simulation of the Dynamic Interaction between Pantograph and Overhead Contact Line," CENELEC, CENELEC, 2022. Google Search
13 
"EN 50317:2025, Railway Applications – Current Collection Systems – Requirements for and Validation of Measurements of the Dynamic Interaction between Pantograph and Overhead Contact Line," CENELEC, CENELEC, 2025. Google Search
14 
European Commission, "Commission Regulation (EU) No 1301/2014 of 18 November 2014 on the Technical Specification for Interoperability Relating to the 'Energy' Subsystem of the Rail System in the Union," 2014. Google Search
15 
"UIC Code 799 (1st ed.), Characteristics of A.C. Overhead Contact Systems for High-Speed Lines Worked at Speeds of Over 200 km/h," UIC, UIC, 2002. Google Search
16 
Z. Liu, Y. Song, S. Gao, H. Wang, "Review of Perspectives on Pantograph-Catenary Interaction Research for High-Speed Railways Operating at 400 km/h and Above," IEEE Transactions on Transportation Electrification, vol. 10, no. 3, pp. 7236-7257, 2023. Google Search
17 
S. Bruni, G. Bucca, M. Carnevale, A. Collina, A. Facchinetti, "Pantograph-Catenary Interaction: Recent Achievements and Future Research Challenges," International Journal of Rail Transportation, vol. 6, no. 2, pp. 57-82, 2018. DOI
18 
"UIC 505-1 OR: Railway Transport Stock – Rolling Stock Construction Gauge," UIC, UIC, 1993. Google Search
19 
"UIC Code 794: Interaction between Pantograph and Overhead Contact Line on the European High-Speed Network," UIC, UIC, 1996. Google Search